- BEFORE: Scaffolding is erected in preparation for removing the roof over the kitchen, hallway and WC.
- View from the back.
- DURING: Tiles start coming off.
- The roof is now on the lawn!
- Kitchen roof is now gone, kitchen open to the sky. New joists are being inserted.
- The build has proceeded up to the second storey, and extra scaffolding has been erected.
- The roof trusses arrive. Unfortunately, when it came time to fit them they turned out to be the wrong size! So more had to be ordered. Then the snow came!
- The second set of roof trusses arrive.
- The roof trusses were installed same day, and by the time I got home the roof was felted, battened and half-tiled, so I do not have a picture of the trusses being installed. This photo was taken the following day, when most of the snow had melted.
- View from the back.
- View from inside, towards the back. The darker half on the left of the roof is the tiled area.
- The apex of the roof from inside.
top