BEFORE: Scaffolding is erected in preparation for removing the roof over the kitchen, hallway and WC.
View from the back.
DURING: Tiles start coming off.
The roof is now on the lawn!
Kitchen roof is now gone, kitchen open to the sky. New joists are being inserted.
The build has proceeded up to the second storey, and extra scaffolding has been erected.
The roof trusses arrive. Unfortunately, when it came time to fit them they turned out to be the wrong size! So more had to be ordered. Then the snow came!
The second set of roof trusses arrive.
The roof trusses were installed same day, and by the time I got home the roof was felted, battened and half-tiled, so I do not have a picture of the trusses being installed. This photo was taken the following day, when most of the snow had melted.
View from the back.
View from inside, towards the back. The darker half on the left of the roof is the tiled area.
The apex of the roof from inside.
top