BEFORE: Front of the house before the build.
DURING: Front ground floor build is done.
Front 1st floor build is started.
Extra scaffolding is erected.
BEFORE: Back of the house before the build.
DURING: Back 1st floor build is started.
The new first floor, looking towards the front.
The new first floor, looking towards the back.
Roof is installed and gable wall completed.
View from the back. The windows have been covered over the Christmas break.
The windows have been installed, and the first 'scratch' coat of render has been applied.
View from the back.
Part of the scaffolding has been removed, and the guttering has been added.
View from the back.