- BEFORE: Front of the house before the build.
- DURING: Front ground floor build is done.
- Front 1st floor build is started.
- Extra scaffolding is erected.
- BEFORE: Back of the house before the build.
- DURING: Back 1st floor build is started.
- The new first floor, looking towards the front.
- The new first floor, looking towards the back.
- Roof is installed and gable wall completed.
- View from the back. The windows have been covered over the Christmas break.
- The windows have been installed, and the first 'scratch' coat of render has been applied.
- View from the back.
- Part of the scaffolding has been removed, and the guttering has been added.
- View from the back.